Structural Steel Estimating Services

Steel bids live and die on tonnage accuracy and scope boundaries. A takeoff that misses connection allowances, understates deck gauge or mixes up fabricator and erector scope produces a number nobody can defend. US Civil Genix provides structural steel estimating and takeoff services for fabricators, erectors, general contractors and miscellaneous-metals shops bidding work across the United States, with dedicated New Jersey and New York coverage.

What we quantify in a steel takeoff

  • Structural framing — beams, columns, girders and braces listed by shape, size, grade and length, extended to weight by member and totaled by sequence or area
  • Joists and joist girders — by designation and span, with bridging
  • Metal deck — roof and composite floor deck by profile, gauge and finish, with closure and accessory allowances
  • Connections — detail-material and connection allowances stated explicitly (percentage or detailed, per your preference), never buried
  • Anchor bolts, base plates and embeds — counted and separated by supplier scope
  • Miscellaneous metals — stairs, rails, ladders, lintels, edge angles and support frames, kept in a separate Div 5 bucket so they can be bid or bought separately

Deliverables arrive as an organized workbook — by CSI Division 5 breakdown, drawing reference and erection sequence where the documents support it — with assumptions and exclusions stated so your team can adjust shop rates, buyout numbers and erection productivity with confidence.

Who uses this service

Steel fabricators pricing supply-and-erect or supply-only scopes; erectors pricing labor from fabricator drawings; general contractors checking Div 5 subcontractor coverage; and misc-metals shops that need fast, accurate quantities during busy bid weeks. On public work in New Jersey and New York, we price erection labor to the applicable prevailing-wage determination — see our New Jersey and New York estimating pages for the compliance context.

Estimating, not just counting

Where the engagement calls for a priced estimate rather than a takeoff alone, we build the number up from material weight, shop labor considerations, coatings, freight assumptions and erection crew-hours — with each element visible, so a change in mill pricing or a revised erection duration can be re-run without starting over. For material buyout support, our procurement service can carry the quantities into supplier quotations, including structural steel and metals sourcing.

Related services

Quantity takeoffs · Construction cost estimating · Bid support · Concrete estimating · Sitework & civil estimating · Outsource estimating

Frequently asked questions

What documents do you need for a steel takeoff?

Structural drawings (framing plans, sections, details, general notes) and specifications. Architectural drawings help capture misc metals; if erection drawings or a fabricator's advance bill exist, we reconcile against them.

How are connections handled?

Your choice: a stated detail-material allowance by member class, or itemized connection material where the details are developed enough to support it. Either way the basis is written into the deliverable — not hidden in the totals.

Do you separate fabrication and erection scope?

Yes. Supply, shop labor, coatings, freight and erection are kept as separate elements so fabricators, erectors and GCs can each pull the part of the number they own.

Can you price steel for NJ/NY public work?

Yes — erection labor is priced to the prevailing-wage determination referenced in your bid documents, and our public works estimating service covers the wider compliance picture.

What does a steel estimate cost?

Takeoffs start at $150 and full estimates at $250 per our published pricing; the confirmed quote depends on tonnage, drawing count and detail level. Upload the structural set to get a confirmed number.